Copyright ©1999 by The Resilience Alliance* Correct format for citing this article: Gilmour, A., G. Walkerden, and J. Scandol. 1999. Adaptive management of the water cycle on the urban fringe: three Australian case studies. Conservation Ecology 3(1): 11. [online] URL: http://www.consecol.org/vol3/iss1/art11/ A version of this article in which text, figures, tables, and appendices are separate files may be found by following this link. Research, part of Special Feature on Adaptive Management Adaptive Management of the Water Cycle on the Urban Fringe: Three Australian Case Studies Alistair Gilmour1, Greg Walkerden2, and James Scandol3 1Macquarie University; 2Wyong Shire Council; 3University of Sydney
Our group at Macquarie University has run three adaptive management projects in New South Wales, Australia. Their objectives were: (1) to evaluate water cycle management strategies to minimize impacts of urban development on water quality in the Hawkesbury-Nepean basin; (2) to evaluate development planning policies to minimize water quality impacts on a series of coastal lakes; and (3) to carry out a preliminary assessment of the potential impacts of greater recreational use of Sydney water catchments. These projects are examined to evaluate the contribution of the adaptive management approach to water cycle management on the urban fringe in New South Wales. The role of the adaptive management approach in education, as a negotiation process, and in policy formulation and evaluation, is presented. The importance of community participation, the role of an "institutional champion," and the need to manage the lead-up phase and the postworkshop phase with as much attention to detail as the workshop phase is underlined. Proposed prerequisites for a successful adaptive management project are developed along these lines.
KEY WORDS: adaptive management, conservation biology, ecosystem management, sustainability transition, sustainable development, water quality, watershed management. Published June 30, 1999. Many adaptive management projects have been carried out in Australia in recent years (Table 1). This paper evaluates three recent projects carried out by our group in New South Wales (NSW) (http://www.gse.mq.edu.au), with a view to improving our understanding of the adaptive management approach. These projects are presented briefly in the context of the original premises of Adaptive Environmental Assessment and Management (AEAM). In the discussion, we examine the issues raised by the case studies and make suggestions to improve the likelihood of a wider adoption of the adaptive management approach.
In their seminal book on adaptive management, Holling (1978) and co-authors developed a set of techniques that integrated environmental issues with economic and social understanding. Their main concern was the failure of environmental impact assessment to deliver better environmental outcomes. Their target audience was people carrying out environmental assessment and communicating the results to senior administrators. They argued that environmental assessment should commence when the design process begins. They (Holling1978) set out to develop a set of techniques to: (1)deal with uncertain information; (2)mobilize available data on partially known processes; and (3) assist with the "formation of objectives that are less sensitive to the unexpected." They emphasised a systems approach and communication as ways to achieve a better shared understanding of the problem. This implied a need to develop simplified models to better understand the behavior of the system. Walters (1975) had emphasised communication between researchers in various disciplines and between researchers and managers. Walters (1986) strengthened the systems tool kit for making judgments about the management implications of uncertainties. Attempts to implement adaptive management approaches have revealed many challenges. Iles (1996) argues that there are fundamental problems with getting adaptive management translated from theory to practice: the legislative and administrative structures are too "top down" to benefit from an adaptive management approach. Walters' (1997) pessimistic assessment supports this general conclusion. He underlines familiar constraints: uncertainty, self-interest, and conflicting values, and singles out the difficulty of getting large-scale management experiments to happen because of the costs and risks. Holling (1995) highlights a prima facie contradiction between ecosystem management and resilience: managerial control reduces variety, which reduces both ecological and social resilience. On this canvas of difficulties, this paper focuses on three strands:
South Creek Project settingSouth Creek Valley Sector (SCVS) lies to the south west of Sydney, the capital of the state of New South Wales, Australia. Proposals to provide new housing in the region were restricted in the early 1990s because of community concerns about the level of pollution in the rivers of the Hawkesbury-Nepean catchment. Potential cost of increased environmental management (Paterson et al. 1993) to future buyers was a central challenge. The then Sydney Water Board had statutory responsibility to supply water, sewerage, and drainage services to urban areas. In 1991, a central policy officer of the Board proposed the use of AEAM to explore new water cycle and environmental management strategies, and regional management adopted the proposal. Participants from the Sydney Water Board, a wide range of government agencies, the land developers, and community organizations were invited to participate. Although community representatives were sought, only one representative of a regional conservation group participated in all of the workshops. Problem analysisParticipants explored the environmental impacts of urban development and the effects of alternative policies to address those impacts over 12 days during 1993-1994. A simulation model of the policy options, which related land use and water cycle management strategies (Fig. 1), was defined in workshop sessions and in working groups. Indicators of system status (graphs and maps) and policy options (Fig. 2) cover the three major dimensions of the system: water management, land management, and socioeconomic issues.
The major outcomes of the study fell into three areas (Gilmour and Walkerden 1994): (1)problem recognition and definition; (2)strategy development; and (3)progress toward consensus. For new urban developments, the management focus was urban run-off and sewage effluent. Other measures that were explored included improvements to the trunk drainage system and more active management of water demand. The study concluded that the pollution loads generated under existing land use patterns and under proposed future developments would not meet water quality guidelines. Although considerable uncertainties were identified (Table 2), it was clear from the modeling sessions that managing the new mix of land uses with best management practices could not deliver water quality that was equivalent to, or better than, the water quality resulting from current land use management practice. A commitment to maintaining water quality therefore required improvements in other parts of the catchment.
Implementation Regional staff of the Water Board developed detailed strategy information in the form of a spreadsheet listing control parameters, indicators of change and system state, and commenced to explore the implications of the range of potential strategies. A major internal report was prepared outlining the outcomes of the project. The groundwork for adaptive management of the water cycle in the development area was put in place. Policy context The composition of the workshops led to a high level of consensus about the policy outcomes, and the Regional manager, who had become the "institutional champion" for the project, supported the outcomes. A change in the charter of the Water Board occurred that directed the Water Board away from resource management, narrowing its focus to corporate-style service provision. As a result, the project was abandoned. Tuggerah Lakes Project settingWyong Shire is located some 100 km north of Sydney on the New South Wales coast. The Tuggerah Lakes and their catchment of approximately 720 km2 constitute the major part of the Shire. The fringes of the Lakes experienced rapid urban development in the 1960s and 1970s. Most of the developing areas relied on septic sewage treatment even though significant portions had soils that were unsuitable for such systems. The largest of the three Lakes is connected to the ocean by a single channel, which in the past was often closed by a sandbar. Community concern about the health of the lakes led to a State Government Inter-Departmental Committee that reported in 1978. A reticulated sewerage system was constructed during the 1980s. From 1988 to 1992, a program of works intended to restore the lakes was carried out. These included:
King and Hodgson (1995) concluded that, despite evidence of degradation by nutrient inputs, the Tuggerah Lakes were only mildly eutrophic. Two main responses to the risks posed by development in the catchment were proposed and discussed in the local press: more point and diffuse source programs to reduce nutrient loads from the catchment, and further enhancing flushing of the lakes by tidal exchange. Although many studies had been undertaken into particular aspects of the Tuggerah Lakes, in 1995 there was no integrated, comprehensive data set. The local government authority, Wyong Shire Council, realized that potential solutions would require the understanding and support of the electorate. Some community leaders were arguing that a second entrance to one of the northern lakes should be constructed to increase flushing. In 1994,the then Environmental Systems Manager proposed evaluating management options for the Lakes and their catchment using an AEAM approach. Workshop participants included eight community representatives, two elected Councillors and six Council staff, an officer from each of three government agencies, and four invited technical specialists. Problem analysis The project involved 17 workshop days and presentations to seven community meetings. The workshops outlined the structure of a decision support model to assist in the evaluation of management strategies for the Lakes and their drainage catchment (Fig. 3). The main issues identified by the participants in the Wyong AEAM workshops were (Walkerden and Gilmour 1996):
The decision support system that documents the workshop participants' analyses of socioeconomic and biophysical issues focused on three submodels: catchment issues, lake issues, and social and economic issues. Workshop participants agreed that eutrophication was the main ecological risk confronting the Lakes, so the main focus of the project was the sources, fate, and management of nutrients and sediment in the catchment and the Lakes (Fig. 4). Participants identified a wide range of uncertainties (Table 3). Examples include the ecological consequences of enlarging the existing entrance channel to the ocean or the construction of a second entrance (Fig. 5), effectiveness of stormwater management structures and influence of lake sediments on nutrient dynamics. Policy strategies were identified (Fig. 6) to control nonpoint sources and to improve flushing.
ImplementationSeries of community information seminars discussing the main issues and communicating progress to date (Fig. 4) were also run in local meeting halls throughout the catchment, after the project was largely completed in April 1996. By the end of the workshop series, a general management strategy was clear, but an action plan had not been developed. Shortly after the end of the project, the Environmental Systems Manager, who had been the "institutional champion," resigned to take a promotion elsewhere. Fortunately, one of the members of the consulting team was appointed to this position, so internal support for the project continued and an implementation program was developed and is being actioned. Policy contextThe participation of both elected councillors, a range of council staff, and community representatives was a strong feature of this project. Despite this, the transfer of knowledge gained in the project was low and there was a lack of commitment within the organization. There was lack of support for the outcomes by government agencies that were not fully committed participants.
Sydney Water Catchment access Project settingThe Sydney Water Corporation (the Sydney Water Board after corporatization in 1995) controls access to the immediate catchments of its water supply reservoirs. Increasing political pressure led to an assessment of the potential impacts of greater recreational use of these catchments. A facilitated workshop approach, with limited AEAM objectives, was used to assist in the development of a management plan for these areas, under the joint sponsorship of the Sydney Water Corporation (SWC) and the NSW National Parks and Wildlife Service (NPWS). Lake Burragorang (Fig. 7) and its catchment, the major storage that supplies most of the potable water to Sydney, was the focus of interest for the main recreational stakeholder groups.
Some 30 stakeholders, managers, and scientists were selected by the sponsoring organizations in discussions with the consultants. The workshop participants were selected on the basis of their knowledge of the geographic area, experience and awareness of current and prospective activities, and expertise in technical disciplines relevant to the issues discussed. The project was a reaction to intense lobbying by some stakeholder groups, particularly those seeking increased access. These groups ranged from conservation and bushwalking clubs with controlled access to the catchments, to the peak body of four-wheel-drive clubs, barred from access, and a lobby group supporting unlimited access to public lands in New South Wales. Many of these groups had a long history of mutual antagonism. Problem analysisSix workshops were held to evaluate the issues, explore management options, and make recommendations. Workshops provided a process in which participants, some of whom were barely on speaking terms, could exchange information. They were structured to gradually move from general to specific issues. Participants were encouraged to distance themselves from the detail of their stakeholder positions to arrive at a consensus on underlying technical and social issues presented in the workshops. A series of technical meetings was held during the workshop process to provide the opportunity for focused discussion on technical issues. After documenting the issues, boundaries of the concerns, and proposed recreational activities, the workshop participants attempted to identify the relationships between recreational activities and their impacts on the catchments. Catchment values included the quality of stored water and ecological and cultural integrity. Indicators for tracking these impacts were identified based on the published literature. It became clear at an early stage, however, that important relationships between activity impacts in the catchments and the health consequences of consuming treated water were undefined and unreported in the literature. Two approaches were identified for making progress in the debate: (1) collecting and interpreting additional information to reduce the uncertainty of activity-impact relationships; and (2) community consultation on the risks, costs, and benefits of recreational access decisions. ImplementationThe workshops recommended studies and strategies supporting these approaches. The workshop report also recommended that, until these studies produce credible information indicating that it is safe and socially acceptable to do otherwise, the current regulations for the protected areas around the water reservoirs should be retained. The SWC has yet to consider the practicability of implementing these recommendations, which include an adaptive catchment management strategy. Policy contextThe water supply and sewerage authority had been recently corporatized and a political decision to hand management responsibilities for the protected catchments to the National Parks and Wildlife Service had recently been taken. The Park Service saw the project as external to their normal plans of management development process. In these circumstances, there was no "institutional champion." The three projects all had water quality issues in a catchment as their primary focus. All had broad directions, provided by the sponsoring agency, that allowed participants a degree of flexibility in determining the agendas for each workshop series. The nature of the participation ranged from minimal community involvement in South Creek, to a preponderance of community representatives in the project regarding access to water supply catchments. A high level of technically skilled participants made systems analysis in workshops considerably easier and quicker. At this end of the spectrum, however, we were concerned that, because few participants had broad community support, the political strength of the workshops' judgments was modest. At the other end of the spectrum, in the Sydney Water Access project, the participants were largely selected on the basis of their stakeholder group representation. Thus, there were too few specialists to ensure a balanced discussion at all times. The selection of participants would appear to require more attention if the goal of community ownership of the adaptive management strategy is to be achieved. A more public selection process with a series of community meetings could proceed the workshops, in an effort to build community support. The Tuggerah Lakes project community should have been interspersed with the workshop sessions to allow more immediate feedback. We have asked participants to complete evaluation forms at the end of each workshop to provide feedback on the progress and effectiveness of the workshop series (Table 4). In each of the three projects, workshops participants' concerns about the AEAM process have fallen into three main areas: (1) weaknesses in the collective understanding of the system (Tables 2 and 3); (2) the approximations involved in modeling; and (3) the impacts of wider political processes of institutional and local, state and federal politics.
Concerns about the political process, raised as potential problems early in each of the projects, reflected a cynicism about what influence studies such as these might have on decision making. In seeming contradiction, there were fears that overenthusiastic use of the modeling tool might occur. Later in the workshop series, concerns were raised about the model in relation to the uncertainty of the data, the identification of key data, and the sensitivity of the process relationships. In the case of South Creek, the more technical participants accepted these limitations, whereas in both the Tuggerah Lakes and the water catchment access projects, further investigations were indicated. The latter project was the most constrained in its recommendations, as a consequence of being sharply focused on human health issues. These three concerns will typically arise in adaptive management projects, because they reflect fundamental difficulties in environmental management. They are similar to those raised in other projects in Australia (Grayson et al. 1994, Grayson and Doolan 1995). Our approach to these three concerns was to discuss these, and other, difficulties of the exercise we were undertaking collectively. The themes that we stressed to workshop participants were:
Most respondents indicated that the adaptive management process was very successful in facilitating their analysis of the environmental system. The adaptive management process, notably the submodel development and review, contributed significantly to the participants' understanding of management issues. Most participants felt that they had achieved a clearer understanding of the structure and dynamics of the systems being investigated. Technical participants also acknowledged an increase in their breadth of understanding of the issues during the course of the workshops. Thus, all three projects demonstrated a rapid acquisition of knowledge by participants. The workshops provided an effective information flow and clearly provided a process for creating shared understandings, as required for a successful adaptive management project (McLain and Lee 1996). The shared understanding of the uncertainties noted in the first two workshops (Tables 3 and 4) was not considered to be a barrier to implementation. The community group in the Tuggerah project gained sufficient understanding of the issues to see the second entrance as a high-risk option, and were able to identify specific, high-priority investigations. The more technically focused group in the first case study was more used to dealing with the uncertainties identified, and the shared understanding gained of the system-wide issues was a good grounding for further cooperative work. The third case study helped the community stakeholders to gain a better understanding of the implications of a lack of knowledge about biophysical processes and allowed them all to sign off on a consensus report recommending no further access at this time. The participants' answers also indicated that, for the most part, they felt that the workshop series succeeded in reducing conflicts over both value-based issues and technical issues. Most felt that their concerns were adequately reflected in the joint analysis. All participants recorded improved levels of understanding of other people's points of view. Participants enjoyed the opportunity to exchange views, and a number commented on their sharpened insight into the issues. Thus, the workshops developed the common ground for joint resolution of policy problems. The process of these projects conformed broadly to Fisher and Ury's (1981) criteria for principled negotiation: focusing on the problem and not the person; focusing on underlying interests, not just policy positions; developing options for mutual gain; and using objective criteria to decide what is fair. The AEAM workshops worked as mediums for "provention" (Burton 1990). Project implementationThe issue of getting agencies to implement AEAM recommendations is more complex than is suggested by the questions of self-interest and self-protection raised by Walters (1997). In all three cases, the agencies were struggling with the political overtones of environmental management problems. They were all seeking a technical solution with broad community support, and chose the AEAM approach as a potentially successful path. None of the sponsors appeared to have thought through the issues involved in implementing the workshop outcomes. On the other hand, Iles' (1996) assertion that our political and legal framework is inappropriate for adaptive management is not borne out by our case studies. An adaptive management strategy is being implemented for the Tuggerah Lakes and is an option for making progress in the management of Sydney's water supply catchment. Getting follow-through on adaptive management workshop projects presents large challenges. We relied on the client to provide the ongoing structure and processes. With hindsight, we would place a much stronger emphasis on getting commitment, at the start of the process, that a key outcome will be that stakeholders will sign off on an implementation strategy, if something approaching consensus can be reached. We would put more emphasis on the role of adaptive management workshops as forums for negotiation. Managing the wider political arena is a problem often neglected by project managers. The South Creek project exemplifies derailment by the wider political process. The corporatization of the Sydney Water Board occurred as Sydney Water shifted its institutional goals away from general water resource management and toward a narrower focus on provision of service. This precluded the development of coordinated implementation strategies based on the AEAM project. In the Tuggerah Lakes case, an adaptive management strategy has been developed in which the lead role in implementation is being taken by the local government authority. The role of the "institutional champion" has been critical in gaining acceptance of the AEAM approach by both council and community participants. In this case, however, the resident "institutional champion" left; in the event that one of the authors (G. Walkerden) had not been appointed to the position, there would have been little or no follow-up from the project, either within or outside the sponsoring Council. The sponsor in the Sydney Water Access project is currently considering follow-up actions based on the recommendations of the first workshop series, so it is too early to draw general conclusions about follow-through from this case study. The absence of an "institutional champion" suggests that follow-up on the proposed adaptive management project is unlikely. It is clear from the South Creek and Tuggerah Lakes projects that there are important long-term benefits to be gained from developing community support for adaptive management strategies. Ecosystem management is a long-term process. In both cases, a single agency has had the lead role in driving follow-through, even though there were multiple organizations involved in the workshops. Events in the lead agencies in both projects demonstrate the vulnerability of adaptive management strategies to organizational change. Clearly, when designing long-term ecosystem management strategies, it is sensible to provide as broad a base of active support as possible. In communities with democratic governance, local community support can play a key role. The local community lives with long-term ecological outcomes and can maintain relationships in which agencies are held accountable. This emphasis on the value of community involvement is echoed in the experiences in the Pacific Salmon Fishery (Hilborn and Luedke 1987), the Columbia River (Lee 1993), and in the Grand Canyon (Wieringa and Morton 1996, Collier et al. 1997). Grayson and Doolan (1995) have covered many of these concerns, but did not develop the issue of the community's role. In all three of our projects, political pressures to create broadly acceptable solutions made a participatory process attractive to the lead institutions. Yet, having achieved a degree of consensus, with a resulting reduction in political pressure, each lead institution scaled back the level of community involvement. There is a tendency to revert to familiar, less inclusive processes, and this works against the long-term needs of ecosystem management. We argue that, as adaptive management demands a more open approach to uncertainty, and a more inclusive approach to decision making, it creates a need for a person within the lead agency to act as a change agent: the "institutional champion." This person needs to be sufficiently influential in the lead agency decision-making processes to be able to keep the project focused on the experiment-review-feedback cycle essential to the implementation of an adaptive management strategy. To be successful, the "institutional champion" should be an excellent communicator at multiple levels within and outside the organization. From a long-term perspective, we need to be working to strengthen the community's ability to hold agencies accountable. Community development of this kind can be driven from the inside (e.g., by an institutional champion) or from the outside (e.g., by community members). When running adaptive management workshops, we should be looking for stakeholders who can maintain a pressure for long-term ecosystem management. This analysis suggests a series of issues (Table 5) that prospective adaptive management projects should consider. These include the need for a phase of the project to focus on laying the ground for the workshops, the workshops themselves, and a more formalized implementation phase. The education and co-option of a senior manager in the sponsoring organization to fulfil the role of institutional champion appears crucial. The cultivation of the community and the evolution of stakeholder participants are more important tasks than previously identified. The development of a clear strategy of continuation of the adaptive management process is essential. The pressures against such a solution are hugh. Budgets, human resources, and time are all constrained, and political pressure is applied by all of the players in the political landscape.
Environmental management problems commonly involve large numbers of stakeholders. Adaptive management recognizes this as both a central constraint on, and an opportunity for, effective environmental management. The large number of stakeholders is a constraint because management strategies that are not broadly supported are unlikely to be effectively implemented. It is an opportunity because the diversity of perspectives provides a resource from which a rich characterization of the environmental problem can be built. Adaptive management takes advantage of the opportunity by involving diverse stakeholders in a joint analysis of the environmental management issues. It deals with the constraint by using the analytical workshops as a context for building mutual understanding, increasing the chances of achieving a consensus among the stakeholders. The approach has a clear role in educating both community representatives and narrowly focused specialists, and it provides a setting for principled negotiation. To increase the effectiveness of adaptive management workshop processes, we recommend:
Responses to this article are invited. If accepted for publication, your response will be hyperlinked to the article. To submit a comment, follow this link. To read comments already accepted, follow this link.
We would like to acknowledge the role of Ian Armstrong (then of Sydney Water), together with Chris Glynn and Ray Abe (of Sydney Water), and Brian Bell (then Manager of Environmental Systems, Wyong Shire Council), for their vision and support for the adaptive management approach and for their faith that we could deliver useful outcomes. We would also like to thank Carl Walters for his enthusiastic support over the years since the early 1980s, and we thank our reviewers for their constructive advice.
Burton, J. 1990. Conflict: resolution and prevention. Macmillan Press, Basingstoke, UK. Collier, M. P., R. H. Webb, and E. D. Andrews. 1997. Experimental flooding in Grand Canyon. Scientific American January 1997: 66-73. Fisher, R., and W. Ury. 1981. Getting to yes: negotiating agreement without giving in. Hutchinson, London, UK. Gilmour, A. J., and D. Geering. 1991. The application of adaptive environmental assessment and management techniques to the management of the Macquarie Marshes, New South Wales. Transactions of Multi-Disciplinary Engineering GE 15(2): 121-125. Gilmour, A. J., and G. Walkerden. 1993. Policy options for South Creek Valley Sector Water Cycle Management Study: a report to the Water Board. Report of the Graduate School of the Environment, Macquarie University, Sydney. Gilmour, A. J., and G. Walkerden. 1994. A structured approach to conflict resolution in EIA: the use of adaptive environmental assessment and management (AEAM). Pages 199-210 in G. Guariso and B. Page, editors. Proceedings of the IFIP TC5/WG5.11 Working Conference on Computer Support for Environmental Impact Assessment, CSEIA 93, Como, Italy, 6-8 October 1993. Elsevier Science B.V., North Holland, The Netherlands. Gilmour, A. J., G. Walkerden, B. Bell, and D. van Senden.1996. The Wyong Adaptive Environmental Management and Assessment (AEAM) Project. Proceedings of the Sixth Annual NSW Coastal Conference, Ulladulla, 12 - 14 November 1996. Grayson,R. B., and J. M. Doolan. 1995. Adaptive environmental assessment and management (AEAM) and integrated catchment management. Land and Water Resources Research and Development Corporation Occasional Paper Number 1/95, Canberra, Australia. Grayson,R. B., J. M. Doolan, and T. Blake. 1994. Application of AEAM (adaptive environmental assessment and management) to water quality in the Latrobe River catchment. Journal of Environmental Management 41(3): 245-258. Hilborn, R., and W. Luedke. 1987. Rationalizing the irrational: a case study in user group participation in Pacific salmon management. Canadian Journal of Fisheries and Aquatic Science 44:1796-1805. Holling, C. S., editor. 1978. Adaptive environmental assessment and management. John Wiley, Chichester, UK. _______ . 1995. What barriers? What bridges? Pages 3-34 in L. H. Gunderson, C. S. Holling, and S. S. Light, editors. Barriers and bridges to the renewal of ecosystems and institutions. Columbia University Press, New York, New York, USA. Iles, A. T. 1996. Adaptive management: making environmental law and policy more dynamic, experimentalist and learning. Environmental and Planning Law Journal 13(4): 288-308. King, R. J., and B. R. Hodgson. 1995. Tuggerah Lakes System, New South Wales, Australia. Pages 19-29 in A. J. McComb, editor. Eutrophic shallow estuaries and lagoons. CRC Press, Boca Raton, Florida, USA. Mapstone, B. D., R. A. Campbell, and A. D. M. Smith. 1996. Design of experimental investigations of the effects of line and spear fishing on the Great Barrier Reef. CRC Reef Research Technical Report Number 7. CRC Reef Research Centre, James Cook University, Townsville, Australia. McLain, R. J., and R. G. Lee. 1996. Adaptive management: promises and pitfalls. Forum. Environmental Management 20(4): 437-448. Paterson, R. G., M/ I. Luger, R. J. Burby, E. J. Kaiser, H. R. Malcom, and A. C. Beard. 1993. Costs and benefits of urban erosion and sediment control - the North Carolina experience. Environmental Management 17(2):167-178. Walkerden, G., and A. J. Gilmour. 1996. Adapative environmental assessment and management (AEAM) program for the Tuggerah Lakes system and associated catchments. Final Report for Wyong Shire Council, Macquarie Research, Sydney, Australia. Walters, C. 1975. An interdisciplinary approach to development of watershed simulation models. Journal of the Fisheries Research Board of Canada 32:177-195. _______ . 1986. Adaptive management of renewable resources. Macmillan, New York, New York, USA. _______ . 1997. Challenges in adaptive management of riparian and coastal ecosystems. Conservation Ecology 1(2):1. [online] URL: http://www.consecol.org/vol1/iss2/art1/ Wieringa, M. J., and A. G. Morton. 1996. Hydropower, adaptive management, and biodiversity. Environmental Management 20:831-840. Wilson, C., R. Argent, R. Bunn, P. Davis, R. Grayson, P. Hairsine, and I. Rutherfurd. 1996. A simple model to illustrate the effects of riparian revegetation on stream values in large catchments. Proceedings of the Conference on Stream Management in Australia, Merrijig, Australia, 19-23 February 1996.
Address of Correspondent: Alistair Gilmour Graduate School of the Environment, Macquarie University, Australia, NSW 2109. Phone: 61 2 9850 7975 Fax: 61 2 9850 7972 agilmour@gse.mq.edu.au *The copyright to this article passed from the Ecological Society of America to the Resilience Alliance on 1 January 2000. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||